Signing is an important milestone, but it is not the end of the process. Payments, documents, inspection, outstanding work and practical handover still need to be managed in a clear sequence.
Follow the written schedule
Keep a calendar of payment dates and required documents. Use the agreed payment route, record references and obtain formal receipts. Inform the relevant party early if an administrative issue could affect timing.
Maintain the property file
Store the signed contract, schedules, receipts, identification documents, correspondence and any approved changes together. Confirm that amendments are documented rather than agreed only by message or telephone.
Inspect before accepting
For a completed or newly delivered home, inspect against the agreed condition and specification. Record unfinished, damaged or missing items with clear photos and a written list.
- Doors, windows and locks
- Water, drainage and visible plumbing
- Electricity and air-conditioning
- Surfaces, fittings and included items
- Meters and available readings
- Keys, access cards and manuals
Complete practical handover
Confirm possession, keys, utilities, maintenance contact and any property-management arrangement. If you are absent, your authorized representative should know exactly what they may sign and receive.
Keep the transaction file complete
After signing, store the final agreement, schedules, receipts, identification copies and written confirmations together. Record each payment against the contract obligation it satisfies. If any detail changes, obtain a written amendment or confirmation rather than relying on a message without context.
For off-plan property, retain progress updates and check the conditions linked to delivery. For resale, confirm when possession, furniture and utility responsibility transfer.
Treat handover as an inspection
Walk through the property systematically. Test doors, windows, water, electricity, hot water and air conditioning. Photograph meter readings, keys and any unfinished or damaged item. Agree in writing who will correct outstanding points and when.
After receiving the keys, address utilities, maintenance contacts, access cards, insurance and property management. A careful handover creates a clean starting point for ownership rather than treating the key photo as the end of the process.
Plan handover before the final payment
Agree who will inspect the property, which specification or inventory applies and how unfinished items will be recorded. The inspection should cover finishes, windows, doors, plumbing, electrical points, appliances, meters, keys and shared access. Photograph readings and defects with the date.
Confirm receipts, remaining balances, utility or management procedures and the documents each party will retain. If you cannot attend, appoint a trusted representative with clearly defined authority. A successful handover is an organised verification process, not simply the moment a key changes hands.
A successful handover closes the administrative file and opens the home with clear records.